AegisAI
Built for garment factories that already run an ERP

The operations brain for your garment factory.

AegisAI sits on top of your ERP and closes the gap between the plan and the factory floor — one cockpit for every order, and the controls to keep each one on schedule, from confirmation to shipment.

Book a demo Explore the suite →

Proven in production at leading garment manufacturers  ·  Zero changes to your ERP

EagleEye command center — portfolio flow, defect rates, capacity, gates and finance across every factory
Our clients

Real factories, in production today

AegisAI runs live inside leading garment manufacturers — not pilots, not slide decks.

Tarasima Apparels Ltd
In production
Remi Holdings Ltd.
In production
Baridhi Garments Ltd
In production
Croydon Kowloon Designs Limited (CKDL)
In production
Sonar Manufacturing Ltd.
In production
How it works

See everything. Fix it in one click.

EagleEye is the cockpit — it watches every order, every line, every factory. Spot a risk, and the fix is one click away: replan it in Planner, or clear the blocker in GreenLight. All of it on your existing ERP.

The AegisAI suite: EagleEye cockpit over Planner and GreenLight, on your ERP The cockpit EagleEye See every order, cut to ship Spot it, replan it Spot it, clear it Plan Planner · AegisPlanner Right order, right line Clear GreenLight Cleared before cutting One suite Live data, both ways Your ERP Your data stays put — zero schema changes, no re-entry Start in the cockpit. Every number drills to the exact order — and the fix is one click away.
Ready to trace the flow?

See this workflow on your own orders

Book a demo
EagleEye · The cockpit

See every order from cut to ship

The 10-second answer to "is anything on fire?"

  • One command center: pieces in flight, defect rates, on-time percentage, at-risk orders — across every factory
  • Trace any order through every stage, from plan to finance, with drill-down to color and size
  • Every number carries its source — tap it and see exactly where it came from
  • Gate-readiness warnings tell merchandisers who to call before the deadline, not after
  • From any alert, jump straight to the fix: replan in Planner, or chase the gate in GreenLight
EagleEye merchandiser cockpit — gate checks, DHU watch and shipment readiness
Merchandisers see gate risk, DHU watch, and shipment readiness together.
Planner drag-and-drop board scheduling orders across factory lines over a calendar
Planning moves from spreadsheet rows to line-by-line allocation.
Planner

Production planning, minus the spreadsheets

Put every order on the right line, first try.

  • Drag-and-drop planning board across all your factories and lines — capacity, holidays, and buyer continuity built in
  • Allocation wizard replaces manual cross-checking across screens and spreadsheets with one guided flow
  • Line scoring engine ranks every option by ship-date fit, line efficiency history, and changeover cost
  • Full factory booked? The overflow router finds and ranks capacity in your other plants
  • Learning-curve aware: new styles ramp up realistically, not optimistically
AegisPlannerAI · advisory mode

A planning copilot that shows its work

Proposals, not black boxes.

  • Continuously scans unallocated orders and proposes the best line, date, and split
  • Every proposal explains itself — efficiency gain, wash capability, continuity — so planners decide with confidence
  • Learns from every accept and reject, per buyer, line, and style
  • When the ERP changes — order cancelled, ship date moved — affected plans are re-checked automatically
  • Ask it in plain language: "which lines can take this order?"

That's advisory mode, live today — and the foundation for what's next.

AegisPlanner dashboard with the APS Intelligence panel surfacing pending AI actions, at-risk critical paths and variance alerts
AegisPlanner explains pending moves before planners approve them.
Where AegisPlanner is headed

From copilot to autopilot

AegisPlanner advises today — it proposes, explains, and learns. This is the direction we're building it toward: an agent that sees further and does more, always with your planners in control.

Auto-pilot allocation

From proposing to placing. The agent is built to move beyond suggestions and place allocations itself — inside the guardrails you set, so you approve the rules, not every order.

Variance forecasting

The slip you can see coming. Reading live production against plan, the agent is being built to tell you which orders will miss their date while there's still room to fix it.

Demand sensing

Plans that move with the buyer. As forecasts shift and orders surge or drop, the direction is an agent that re-plans around the change instead of waiting to be told.

Conversational planning

Ask your plan anything. Beyond a single query, the vision is a planner you hold a conversation with — in plain language, with reasoning you can follow.

GreenLight

Every order cleared for production

Two lanes — department alignment and fabric quality — converge on one gate. Nothing cuts until both are green.

GreenLight Meetings

One gated pipeline from sample to cutting — sample approval, size set, pre-production meeting, cut approval — with PCD countdowns on every style and specs that lock once approved.

GreenLight Quality

Nine technical fabric tests with the formulas built in, tiered visual inspection, and auto-approval thresholds that clear good fabric fast — mobile-first, for the warehouse floor.

How GreenLight clears an order for production Meetings Sample approval Buyer sample confirmed Size set Size run approved PP meeting Every department signs Quality Fabric received Every roll logged Lab tests Nine technical checks Inspection Tiered visual check Cut approval The green light Production begins No order reaches the floor until both lanes are green — alignment signed, fabric cleared.
Production clearance

Book a demo with your factory calendar

Book a demo
Why AegisAI

Built for factories, not demos

Your ERP stays

AegisAI reads your live data — zero schema changes, no migration, no double entry.

Built on the factory floor

Every feature was shaped in production at leading garment manufacturers, not in a demo lab.

AI you can audit

Every AI proposal shows its reasoning. Your planners approve; the system learns.

One suite, one platform

The products share one API and one design language — adopt one, add the rest when ready.

Factory floor team holding tablets running the AegisAI suite
Quality team reviewing an inspection on a tablet on the factory floor
Not a demo lab — real teams, running AegisAI on the floor every day.
About

Built by someone who's solved this before

Khondker Rumman Akhter
Khondker Rumman Akhter
Founder, AegisAI

A technology leader who spent 25 years building real-time systems where missed signals are expensive — then brought that discipline to garment operations.

Connect on LinkedIn
  • 25+ years in technology
  • Director at Morgan Stanley
  • 100+ engineers led across 3 continents
  • 16 systems unified into one platform
  • Hong Kong based
Mohammad Johirul Islam
Mohammad Johirul Islam
Country Manager & Executive Director, Bangladesh

The on-the-ground operator for Bangladesh, with deep ERP and factory-floor experience across large RMG groups.

Connect on LinkedIn
  • 18+ years in enterprise IT
  • 15+ years in garment ERP
  • MSc CSE · Summa Cum Laude
  • PMP & Scrum trained
  • Dhaka, Bangladesh

See it on your own orders.

A live demo with your product types, your lines, your calendar.

Book a demo